Junior EstimatorInteriors Background

Received Enquiries.
Check, verify
eview all documents, specifications, shop drawings, BOQ.
If there is no BOQ, prepare BOQ form the tender drawings.
Submittal of cost estimation
Preparation of Cost breakdown
Cost Analysis
Preparation of Quotation for submission incorporates with GM/GM in charge with all qualifications, Conditions, Exclusions etc.
For awarded projects, make comparison with shop drawing & Tender drawing for finding out variations.
If the variation is due to the design changes from the tender stage drawing, Submit variation claims for extra over cost. (It should be incorporation with Design and Project Managers).
Keep cool relationship with colleagues for the overall healthy atmosphere of the entire firm
: Confidential Company
: 5200
: دوام كامل
: ساعات عمل حرة
: 2020-02-26
: 2020-03-26
: الكل
: لا يشترط
: لا يشترط
: 209
ملحوظة هامة:
وظايف نت ليست شركة توظيف وانما موقع للاعلان عن الوظائف الخالية المتاحة يوميا فى أغلب الشركات بالشرق الاوسط ,فنرجو توخى الحذر خاصة عند دفع اى مبالغ او فيزا او اى عمولات. والموقع غير مسؤول عن اى تعاملات تحدث من خلال الوظائف المعلنة.

كيف تحدد مصداقية الوظائف المعلنة؟

قدم سيرتك الذاتية الان


التقديم مباشرة من الرابط!